Find Transformer Monitoring System, Test System, Transformer Testing System on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Home > Products > Transformer Machines > Others Transformer Machines > Fully Automatic Transformer Integrated Test System Equipment Machine

Fully Automatic Transformer Integrated Test System Equipment Machine

Basic Info

Model No.:  transformer testing system

Product Description

Model NO.: Transformer Testing System Power: Electronic Usage: Transformer Testing, Manual Control Power Supply: AC220V+10% 50Hz+2% Transport Package: Nude Packing Origin: China Warranty: 12 Months Humidity: 30%~90% Temperature: 0~40 Trademark: Haoshuo Specification: transformer testing system Fully automatic Transformer Integrated Test System Equipment Machine 1.Technical requirements
1.1Object for test

35kV normal power transformer and special transformer, capacity 2500kVA or under (all current)

10kV normal distribution transformer and special transformer, capacity 2500KVA or under (full current)

1.2Object voltage classes requirements

Impedance under 8%

High voltage side: 6.3KV-35KV

Low voltage side: 0.1KV-10KV

1.3Capacity requirements

High voltage side voltage class 10KV, power transformer and distribution transformer capacity 4000KVA or under

And requirements for test standard list as follows   1.4Modeling test

Lightning impulse test

Temperature rise test

1.5Special test 

Noise test

Harmonic wave analysis test

Zero sequence short circuit impedance   In all,

0.2KV - 11KV voltage is measured through high voltage current, voltage transformer by using no-load transformer load tester. High voltage current transformer (rated work voltage 20KV/150Hz) ratio option 200A, 100A, 50A, 25A, 10A, 5A, 2.5A/1A, total nine grades, precision class 0.05 level.

Voltage transformer is supposed to satisfy ratio 10KV, 6KV, 3KV, 2KV, 1KV/100V total five grades, precision is 0.05 level

 
Serial Routine Test procedure Predelivery test Field test
1 Transformer no-load current percentage and no-load loss test
2 Transformer short-circuit impedance percentage and load loss test
3 Transformer power-frequency voltage-withstand test
4 Transformer direct current resistance test
5 Transformation groups and error test
6 Transformer frequency multiplication withstand voltage test
7 Transformer temperature rise test
8 Transformer dielectric oil withstand voltage test
9 Transformer insulation resistance test


Fully Automatic Transformer Integrated Test System Equipment Machine

  FAQ: 1) Q: Are you manufacturer or trading company? A: We are manufacturer and trading company .   2) Q: Do you provide installing and training overseas? A: Overseas machine install and worker training services are optional.   3) Q: How is your after sales support? 
A: We provide technical support on line as well as overseas services by skillful technicians.   4) Q: How does your factory do regarding quality control?  A: There is no tolerance regarding quality control. Quality control complies with ISO9001. Every machine has to past testing running before it's packed for shipment.   5) How can I trust you that machines pasted testing running before shipping? A:  1) We record the testing video for your reference. Or,     2) We welcome your visit us and test machine by yourself in our factory.   6) Q: Do you sell only standard machines? A: No. Most machines are made to order.   7) Q: Will you deliver the right goods as ordered? How can I trust you? A: Yes, we will. We are Gold supplier of Made-in-China with SGS assessment (Audit report can be provided). 


Contact us: 
Tel: +86 151 5222 5198
 
   
 
 

Contact us if you need more details on Transformer Monitoring System. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Test System、Transformer Testing System. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Transformer Machines > Others Transformer Machines

Email to this supplier
  • *Subject:
  • To:

  • *Messages:
    Your message must be between 20-8000 characters